JACEK1
Key Member
- Joined
- Feb 10, 2013
- Member Type
- Interested in Language
- Native Language
- Polish
- Home Country
- Poland
- Current Location
- Poland
Hello all users!
I wonder which version is better:
The time needed to lift a ship weighing 7200 tons is about 100 minutes when the dry-dock’s ballast pumps work without a break.
Or
It takes about 100 minutes for the dry-dock’s non-stop working ballast pumps to lift a ship weighing 7200 tons.
I would choose the second one.
I wonder which version is better:
The time needed to lift a ship weighing 7200 tons is about 100 minutes when the dry-dock’s ballast pumps work without a break.
Or
It takes about 100 minutes for the dry-dock’s non-stop working ballast pumps to lift a ship weighing 7200 tons.
I would choose the second one.